Kimberly (kimberly_a) wrote,
Kimberly
kimberly_a

  • Mood:

Addendum to my previous post ... and socks

After receiving my email detailing the electrician's findings re: the cause of our electrified tub and shower fixtures, our formerly beloved contractor replied simply, "I'm sorry that happened" (actually, "I'm sorry for that happen," because English is not his first language, but I knew what he meant).

Apparently, in Ting's world, electrified bathtubs just happen. It may not be literally passive voice, but in meaning it clearly is. Sigh. Next time we want work done on our house, I'll be searching for a new contractor.

In other news, last night at the Sockshop I bought some cool socks that totally remind me of Fruity Pebbles:

Fruity Pebble socks & friends

(Included in the photo is another pair of socks I bought at the same time. Both are very soft, and I can't wait to wear them!)
Tags: construction, contractor, house, remodel, socks
Subscribe

  • Occipital Neuralgia Headaches

    Fuck. I didn't do my PT neck stretches reliably while we were on vacation or during the week+ that I was sick after we got home ... and my occipital…

  • Knees, Stairs, and Attitudes

    I've been out-of-sorts (feeling grumpy and vulnerable, mostly, sort of mixed up together) since my visit to the physical therapy doc, mostly—I…

  • Asthmatic bronchitis?

    I've been resting and resting, coughing and coughing, but things may finally be improving! April 7 (seven weeks ago): The cough became violent &…

  • Post a new comment

    Error

    Anonymous comments are disabled in this journal

    default userpic

    Your IP address will be recorded 

  • 2 comments